Orlando International ATCT
Table of Updates
Date | Revision | Items Revised |
---|---|---|
2 May 2023 | A | Update of Organization |
5 June 2023 | B | Added PDC Not Authorized, Removal LOAs, Added LUAW Section, Organization |
Area Information
ICAO Code | Airport Name | Airspace | IFR Beacon Codes | VFR Beacon Codes |
---|---|---|---|---|
KCAE | Columbia Metro Airport | C | 1601-1677 | 1601-1677 |
Purpose This document prescribes the procedures to be utilized for providing air traffic control services at the Columbia Metro Air Traffic Control Tower (CAE ATCT) and TRACON. The procedures described herein are supplemental to the Jacksonville ARTCC Facility Operating Guidelines and FAA Order JO 7110.65, as well as any published FAA guidelines or procedures. Distribution |
Operational Positions
Position | Radio Name | Callsign | Relief Callsign | Symbol | Frequency |
---|---|---|---|---|---|
Clearance Delivery | Columbia Clearance Delivery | CAE_DEL | CAE_1_DEL | 7CD | 119.750 |
Ground | Columbia Ground | CAE_GND | CAE_1_GND | 7CG | 121.900 |
Tower | Columbia Tower | CAE_TWR | CAE_1_TWR | 7CT | 119.500 |
Position | Sector Name | Callsign | Relief Callsign | Symbol | Frequency |
---|---|---|---|---|---|
RN | Radar North | CAE_N_APP | CAE_1N_APP | 7RN | 133.400 |
RS | Radar South | CAE_S_APP | CAE_1S_APP | 7RS | 124.150 |
RF | Radar Final | CAE_F_APP | CAE_1F_APP | 7RF | 128.500 |
Sector in Red is the primary sector.
Clearance Delivery
General Information
Clearance Delivery Responsibilities
The Clearance Delivery Controller Must:
- Formulate and issue all IFR clearances to aircraft departing this field.
- Review proposed flight plan information for accuracy and amend routings and altitudes, as necessary, in accordance with this SOP.
- Enter amendments to flight plans into the controller client as required and advise the pilot what those amendments are.
- Issue clearances or route changes to aircraft, as required complying with traffic management initiatives and/or weather avoidance.
- Forward and await a response on all non-standard routing requests to the affected facilities.
- During Events: Do not change routes or proposal times for aircraft participating in Traffic Management programs without prior coordination with the controller in charge.
Pre-Departure Clearances
IFR Departures
Planned/Amended Routing
All Aircraft shall be "cleared as filed unless a route amendment is necessary.
Assigned Altitudes
Aircraft shall be instructed to maintain 4,000 feet and to expect their cruise altitude (if higher) ten minutes after departure.
Departure Frequency
The Primary Departure Frequency is CAE_S_APP on 124.150
Squawk Assignment
All IFR Squawk codes will be auto-assigned by the controller client.
It should assign a code between 1601-1677. Controllers shall not change the auto-assigned code if a code between 1601-1677 is not assigned.
VFR Departures
Clearance
VFR Aircraft do not need explicit clearance to enter or exit the airspace.
Assigned Altitudes
Jet: VFR aircraft shall be instructed to maintain VFR at or below 2,000.
Turboprops: VFR aircraft shall be instructed to maintain VFR at or below 2,000.
Props: VFR aircraft shall be instructed to maintain VFR at or below 2,000.
Departure Frequency
Aircraft not remaining in the pattern shall be given the Departure Frequency of CAE_S_APP on 124.150.
Aircraft remaining in the pattern shall not be given a departure frequency.
Squawk Assignment
VFR Squawk codes shall be assigned by the controller client using the assign squawk feature in their controller client.
Ground
General Information
Ground Control Responsibilities
The Ground Controller is responsible for the movement of vehicles and aircraft on the airport movement areas except for the active runway(s)
ATIS
Ground control shall confirm all pilots have the current ATIS code PRIOR to commencing taxi to the active runway. This can be achieved by requesting the pilot "state the current ATIS code". The ATIS is the responsibility of the tower controller.
Active Runway Operations
Except for runway crossings, Ground Control must transfer communication to Local Control if a vehicle/aircraft is to operate on a runway. Coordination for all runway crossings must be accomplished by requesting permission from local control by stating "(Number of Aircraft) to cross Runway (#) at Taxiway (Letter). Once approved and crossing has been granted and the crossing has been observed, ground control must state to local control "Runway (#) crossing complete"
Intersection Departures
Ground Control must advise local control of all intersection departures verbally.
Opposite Direction Departures
Ground Control must coordinate and obtain approval from Local Control, prior to taxiing an aircraft to a runway for an opposite-direction departure.
Pushback and Startup
Push back into a controlled area: Aircraft shall be instructed: "Push and Start Approved, tail facing (direction)." The direction should keep the aircraft pointed in the direction the aircraft will taxi.
Push back will not enter a controlled area: Aircraft shall be instructed: "Push and start at pilot's discretion."
Runway Assignments
The runway assignment should be the runway closest to the position of the aircraft based on the Active Runway Assignments as selected by the Local Controller.
Taxi Operations
Aircraft taxing to a runway shall be given the closest and shortest taxi instructions to the active runway.
Transfer of Communication
Departing aircraft shall be instructed to contact the local control frequency upon or slightly before holding short the runway for departure. Local control has the option to have the pilot "monitor" the frequency. If a pilot is going to monitor, ground control must send a private message via the controller client of the aircraft with their callsign and runway. </tab> </tabs>
Tower
Active Runway Selection
The active runway shall be determined based on wind and known
factors that may affect the safety of takeoff/landing operations.
Runway 11 is designated as the calm wind runway.
7110.65Z Runway Selection
Area of responsibility
LC has responsibility for a five-mile radius from the CAE field from the surface up to and including 2,500 feet. LC has the responsibility to control 4,000 feet and below 1 ½ miles on either side of the extended centerline within 5 miles of the departure end of the automatic departure runways.
Arrival Procedures
LC shall be responsible for separation of all arrival aircraft that have
been handed off by TRACON from all departing aircraft still under LC
jurisdiction
Practice Instrument Approaches: Issue special instructions as verbally coordinated with the
TRACON. Practice Instrument Approaches shall assign runway heading and maintain 4,000 feet. Departure frequency as assigned by approach control.
LC shall NOT change the approach sequence without coordination. Communication transfer must be completed prior to five nautical miles
from the runway.
Automatic Terminal Information Service
LC shall manage the ATIS for KCAE
The ATIS shall be on 120.150
Automatic Releases
LC is authorized automatic releases from the TRACON controller so long as the aircraft departs on the pre-coordinated active departing runway(s) on approved departure headings
In order for automatic releases to be authorized, procedures in this document shall be followed.
Departure releases must be obtained if automatic releases are suspended by TRACON.
Departure Procedures
LC will provide separation for aircraft in the LC airspace.
LC shall provide initial radar separation between successive departures.
When automatic departures are in effect, IFR jet/turbojet departures
shall be released on runway heading climbing to 4,000 feet.
LC has the option to assign all NON-JET aicraft runway heading or a fanned heading that will conform to the applicable departure corridor.
Go Around/ Unplanned Missed Approaches
LC shall assign IFR aircraft runway heading and 4,000 feet
LC must verbally coordinate with departure prior to frequency change.
Line Up and Wait
Line up and wait is authorized at this field only in VMC Conditions. LUAW departures from an intersection are only authorized between sunrise and sunset.
Visual Tower
Columbia Metro ATCT is a visual/VFR tower and shall not initiate or accept any radar handoffs and shall not initiate control/start track on any target.