ZDC LOA: Difference between revisions

From ZJX ARTCC SOPs
Jump to navigation Jump to search
No edit summary
Line 6: Line 6:
!Effective Date
!Effective Date
|-
|-
|ZTL
|ZDC
|Washington ARTCC
|Washington ARTCC
|1 February 2024
|1 February 2024
Line 16: Line 16:
This agreement is made by and between Jacksonville ARTCC (herein ZJX) and Washington ARTCC (herein ZDC) of the United States Division of the Virtual Air Traffic Simulation Network (herein VATSIM).  
This agreement is made by and between Jacksonville ARTCC (herein ZJX) and Washington ARTCC (herein ZDC) of the United States Division of the Virtual Air Traffic Simulation Network (herein VATSIM).  


'''Cancellation:''' This LOA cancels any pre-existing LOA between ZJX and ZDC. This LOA shall become the agreement in use on the effective date.  
'''Cancellation:''' This LOA cancels any pre-existing LOA between ZJX and ZDC. This LOA shall become the agreement in use on the effective date.


== [[General Responsibilities|Authorized Coordination]] ==
== [[General Responsibilities|Authorized Coordination]] ==

Revision as of 18:20, 17 January 2024

ARTCC Information

ARTCC Code ARTCC Name Effective Date
ZDC Washington ARTCC 1 February 2024

Scope: This agreement is made by and between Jacksonville ARTCC (herein ZJX) and Washington ARTCC (herein ZDC) of the United States Division of the Virtual Air Traffic Simulation Network (herein VATSIM).

Purpose: This agreement is made by and between Jacksonville ARTCC (herein ZJX) and Washington ARTCC (herein ZDC) of the United States Division of the Virtual Air Traffic Simulation Network (herein VATSIM).

Cancellation: This LOA cancels any pre-existing LOA between ZJX and ZDC. This LOA shall become the agreement in use on the effective date.

Authorized Coordination

-ZJX may clear aircraft direct ILM without prior authorization.

-ZDC may clear aircraft direct CRE, FLO without prior authorization.

-ZJX will announce via ATC chat any details of internal delegation (splitting) upon sign-on where both ARTCCs are online.

-Both ARTCCs should make all efforts to ensure that handoffs occur at least 10 nm from the agreed border. Handoff requests may be initiated up to 50 nm without prior coordination.

-Both ARTCCs should make all efforts to ensure adequate or better (10-15 MIT) sequencing and separation prior to any and all handoffs.

Standard Altitude Restrictions

ZJX to ZDC
Arrival Airport/Area Altitude Restriction Note
RDU BOUNDARY AOB FL210 JURDI/TENNI FL210
FAY BOUNDARY AOB 15k, FOR 11k H/O TO FAY ATCT
ILM BOUNDARY AOB 15k, FOR 11k H/O TO ILM ATCT


ZJX to ZDC
Arrival Airport/Area Altitude Restriction Note
CAE BOUNDARY AOB FL220 N/A
MYR BOUNDARY AOB 11k H/O TO MYR ATCT, AUTO P/O APPVED
FLO BOUNDARY AOB 5k H/O TO FLO ATCT, AUTO P/O APPVED

Airspace Delegation

ZJX delegates to ZDC (ILM) the responsibility for ATC service as depicted.

ZDC.JPG


Source Document